Ambulance Parking 3d 3.2 Icon

Ambulance Parking 3d

3d Fever Racing
3.3
336 Ratings
50K+
Downloads
3.2
version
Mar 08, 2016
release date
34.1 MB
file size
Free
Download

What's New

About Ambulance Parking 3d Android Game

Everyone knows that ambulances are arriving early when an accident happens when someone feels sick or when someone has health problems. Ambulance cars go after patients return to the hospital, but the question is where they park? Today we will try to park a car ambulance, in many places, because it's always free primary ambulance site. The game looks easy but requires attention and accuracy of your partre. Follow the instructions to not make mistakes and complete all tasks very well.

1) First you have to choose if we want to drive with the steering wheel or if you want to rotate your phone to steer
2) The game is divided into 9 levels that will capture the attention and that will test your abilities and skills
3) must successfully finish these nine levels to complete the game and receive the prize for the best driver.
4) Try not to hit the obstacles because the patient's life is very important and if you do this you will have to start from the beginning all levels, no matter where it happened hit.

This game is a new one that will test your driving experience, precision and skill that you have. Try to finish all the levels as fast to get more stars that will show how well you were prepared to park and to drive this ambulance car.

If you liked this game, you can choose other, ambulance 3d games, 3d car games and 3d parking games, and car games from our developer '3D Fever " to see if you'll play as well as you did it.

Other Information:

Requires Android:
Android 2.3.2+ (Gingerbread, API 9)
Other Sources:
Category:

Download

This version of Ambulance Parking 3d Android Game comes with one universal variant which will work on all the Android devices.

Variant
3
(Mar 08, 2016)
Architecture
armeabi-v7a
Minimum OS
Android 2.3.2+ (Gingerbread, API 9)
Screen DPI
nodpi (all screens)

All Versions

If you are looking to download other versions of Ambulance Parking 3d Android Game, We have 3 versions in our database. Please select one of them below to download.

Loading..