- Minor bug fixes
It is an addictive puzzle game inspired by the mathematical concept of annulus. Annulus (the Latin word for "little ring") is a ring-shaped object, especially a region bounded by two concentric circles.
Challenge is to combine similar rings/annuli and complete the circles.
- Swipe left, right, up or down to move all the rings/annuli in the same direction.
- Same-sized 'blue' rings/annuli merge to form a larger 'green' annulus.
- Same-sized 'green' rings/annuli merge to form a larger 'blue' annulus.
- Two max sized blue (or green) annuli complete the circle.
Play tactfully to hop through different levels and unlock donuts. Each donut reward requires certain number of blue/green circles.
This version of Annulus Android Game comes with one universal variant which will work on all the Android devices.
If you are looking to download other versions of Annulus Android Game, We have 1 version in our database. Please select one of them below to download.