Can Shooter 360 1.3 Icon
3.4
1.1K Ratings
100K+
Downloads
1.3
version
Jul 24, 2015
release date
20.7 MB
file size
Free
Download

About Can Shooter 360 Android Game

Ready to THROW... feel yourself as a sniper aiming, and shooting piles of cans!
Challenge your aim, and push your puzzle-solving skills to shoot all the cans in one go.

Game Themes:
There are five game themes
All are interesting but different with environment in 360 degree complete rotation around you.

Game Features:
1- Full 360 rotate game environment
2- Excellent 3D Graphics
3- Smooth controls
4- Challenging levels in beautiful 3D locations
5- Unlock new levels, open new locations & themes
6- Perfectly-tuned physics engine
7- Addictive Game Play
8- Show off your shooting skills; make higher scores and challenge your friends!

Game Play:
- Select any unlocked theme to play
- You have to play all 16 theme levels
- When all theme levels are completed successful new theme will unlock
- swap screen left or right with finger to rotate the environment in complete 360 degree angle horizontally
- Aim the cans piled on each other and shoot

Please visit our website for more information:
www.absologix.com
www.facebook.com/absologix

Other Information:

Package Name:
Requires Android:
Android 2.3.2+ Gingerbread (API 9)
Other Sources:
Category:

Download

This version of Can Shooter 360 Android Game comes with one universal variant which will work on all the Android devices.

Variant
4
(Jul 24, 2015)
Architecture
Minimum OS
Android 2.3.2+ Gingerbread (API 9)
Screen DPI
nodpi (all screens)

All Versions

If you are looking to download other versions of Can Shooter 360 Android Game, We have 1 version in our database. Please select one of them below to download.

Loading..