Discount Calculator & Mirror 1.3.2 Icon

Discount Calculator & Mirror

South Engineering SRL Shopping
4
70 Ratings
10K+
Downloads
1.3.2
version
Sep 29, 2015
release date
1003.9 KB
file size
Free
Download

What's New

- BugFix;

- Mirror function is avaible only into devices with frontal camera;

About Discount Calculator & Mirror Android App

"Discount Calculator & Mirror - Women Edition" is born to solve women necessity to calculate the discount of a price in a faster and easier way. Discount Calculator is:

- A discount calculator application (single and double);
- A versatile and easy to use application;
- Immediate, thanks to the women studied graphic created to facilitate use. Keyboard shortcuts to change easily the value of the discount (-10%, -1%, +1%, +10%) and to enable the double discount;
- Multilanguage: well-supported 7 languages ​​(Italian, English, French, Spanish, German, Portuguese, Swedish);
- A portable mirror: Do you need to try a hat or a necklace but can not find mirrors around you? Discount Calculator is the only application that with "mirror" mode enabled allows you to be able to mirror (must be present in the device a front camera).
Discount Calculator, all you need for a high-class shopping.

KW
calculate percentage discount mirror sales application single discount double discount pink women tutorial fast mirror

Other Information:

Requires Android:
Android 2.2+ (Froyo, API 8)
Other Sources:

Download

This version of Discount Calculator & Mirror Android App comes with one universal variant which will work on all the Android devices.

Variant
8
(Sep 29, 2015)
Architecture
Unlimited
Minimum OS
Android 2.2+ (Froyo, API 8)
Screen DPI
nodpi (all screens)

All Versions

If you are looking to download other versions of Discount Calculator & Mirror Android App, We have 1 version in our database. Please select one of them below to download.

Loading..