Easter Eggs Live Wallpaper 1.0.6 Icon

Easter Eggs Live Wallpaper

HappyLWP Personalization
3.9
93 Ratings
10K+
Downloads
1.0.6
version
Sep 06, 2015
release date
3.0 MB
file size
Free
Download

What's New

- Enable Hardware acceleration for tablets

- Icons improvements

- Fix minor issues

About Easter Eggs Live Wallpaper Android App

Looking for good Easter mood? Our set of live wallpapers will color your Easter!

Beautiful transparent eggs are mixing and clashing when you shake your device. We promise to you realistic shaky motion.
You should try to check your luck and find Happy Easter Egg! When you touch this egg, greeting message will appear on the screen and you will hear congratulations. But you will not be disappointed if you don’t guess that particular egg at once – any egg will jump up with your touch.
No advertisement in both FREE and PRO version!
FREE version of the program has the limited functionality.
Buy PRO version to get five extra egg types(!) and experience more settings for the wallpaper - be your own designer! You will be able to change a size, a number, elasticity, a mass of eggs; even world gravity will be in your power!
Celebrate Easter with fun!

PERMISSIONS: Internet access to check usage statistics and send crash reports.


Works great with phones, tablets, or any device that supports live wallpapers.
Problems? Just email our support team with the model of your phone and a description of the problem.

Other Information:

Requires Android:
Android 2.1+ (Eclair MR1, API 7)
Other Sources:

Download

This version of Easter Eggs Live Wallpaper Android App comes with one universal variant which will work on all the Android devices.

Variant
7
(Sep 06, 2015)
Architecture
armeabi armeabi-v7a x86
Minimum OS
Android 2.1+ (Eclair MR1, API 7)
Screen DPI
nodpi (all screens)

All Versions

If you are looking to download other versions of Easter Eggs Live Wallpaper Android App, We have 1 version in our database. Please select one of them below to download.

Loading..