Electrical Study 1.0.3 Icon

Electrical Study

SARU TECH Education
4.4
4.1K Ratings
100K+
Downloads
1.0.3
version
Jul 15, 2015
release date
30.5 MB
file size
Free
Download

What's New

Now Totally free. Over 500 chapters, Objective Exercise, Theory, Videos, Illustrations....

About Electrical Study Android App

Welcome to Electrical Study app. This app covers entire aspects of the subject, from basic engineering to advanced and modern topics related to Electrical Engineering and Technology.

All articles of this app are totally based on practical experiences as well as a strong base of theoretical knowledge and is written in very simple and understandable English.

The App Contains About 500 Topics, Objective Questions with Answers Covering all topics discussed, Comments and Feedback.

Articles are well explained using images, Some Topics Contains Video Illustrations, but requires internet connection.

Other Information:

Requires Android:
Android 2.3.4+ (Gingerbread MR1, API 10)
Other Sources:

Download

This version of Electrical Study Android App comes with one universal variant which will work on all the Android devices.

Variant
10003
(Jul 15, 2015)
Architecture
Unlimited
Minimum OS
Android 2.3.4+ (Gingerbread MR1, API 10)
Screen DPI
nodpi (all screens)

All Versions

If you are looking to download other versions of Electrical Study Android App, We have 1 version in our database. Please select one of them below to download.

Loading..