Esoteric Abjad Calculator 24.06.2014.3 Icon

Esoteric Abjad Calculator

thereisonlywe Tools
4.4
653 Ratings
50K+
Downloads
24.06.2014.3
version
Aug 06, 2015
release date
3.2 MB
file size
Free
Download

What's New

About Esoteric Abjad Calculator Android App

Esoteric Abjad Calculator supports almost all abjad systems (Eastern/Mashriq, Western/Maghreb, Ibn Arabi's, Ontological) and types (True, Single digit, Literal, Mod12, Dotless Only, Dotted Only). Arabic keyboard is already provided inside application. To copy abjad result to the clipboard, just click on it.

In the first three abjad systems, values are simply calculated by addition of all number values of letters making up an expression. Each system assigns a different value to each letter.

Ontological Abjad System we developed considers each Arabic word as a number in number base 28; each letter valued in ontological order (taken from Ibn Arabi's work) starting from 1 as Alif/Aleph, increasing with letter order and finally ending with 0 as Waw. This one is the only abjad system in which the letter order is taken into account.

Known bug: ة doesn't work. Use ه instead.

Other Information:

Requires Android:
Android 2.3.4+ (Gingerbread MR1, API 10)
Other Sources:
Category:

Download

This version of Esoteric Abjad Calculator Android App comes with one universal variant which will work on all the Android devices.

Variant
10
(Aug 06, 2015)
Architecture
Unlimited
Minimum OS
Android 2.3.4+ (Gingerbread MR1, API 10)
Screen DPI
nodpi (all screens)

All Versions

If you are looking to download other versions of Esoteric Abjad Calculator Android App, We have 1 version in our database. Please select one of them below to download.

Loading..