Fahri Hamzah 1.5 Icon
4.5
24 Ratings
500+
Downloads
1.5
version
Feb 03, 2016
release date
2.7 MB
file size
Free
Download

What's New

Changes:

- New server

- Video Category

About Fahri Hamzah Android App

FAHRI HAMZAH OFFICIAL SITE

Fahri Hamzah, Anggota DPR RI F-PKS

Cara mudah mengakses fahrihamzah.com
Baca informasi dari fahrihamzah.com secara offline. Fitur konten memuat berita dan artikel.
Berita diupdate setiap hari. Memuat topik yang berhubungan dengan Fahri Hamzah.

Fitur:
- Menyajikan update berita mengenai Fahri Hamzah
- Dengan sinkron konten, bisa baca informasi secara offline
- Ganti tema (Hitam/Putih)
- Share artikel ke aplikasi lain
- Tampilan Holo, swipe dengan mudah
- Fitur download langsung dari aplikasi
- Favorit artikel
- Unread indikator
- Mengatur ukuran teks artikel hingga menerjemahkan ke bahasa lain
- Widget aplikasi

More Features, visit http://fahrihamzah.com
Follow Twitter @Fahrihamzah

Tag: Fahri Hamzah, PKS, Politik, DPR, Century, KPK, NTB, Partai Keadilan Sejahtera, Komisi III, KAMMIFahri HAMZAH OFFICIAL SITE

Fahri Hamzah, Member of Parliament F-MCC

An easy way to access fahrihamzah.com
Read information from fahrihamzah.com offline. Content includes news and articles.
News updated daily. Includes topics related to Fahri Hamzah.

Features:
- Presents news updates concerning Fahri Hamzah
- With synchronous content, information can be read offline
- Change the theme (Black / White)
- Share articles to other applications
- Display Holo, swipe with ease
- Features downloaded directly from the application
- Favorite article
- Unread indicator
- Set the text size to translate articles into other languages
- Widget app

Features more, visit http://fahrihamzah.com
Follow on Twitter @ Fahrihamzah

Tags: Fahri Hamzah, MCC, Politics, Parliament, Century, KPK, NTB, the Prosperous Justice Party, Commission III, KAMMI

Other Information:

Requires Android:
Android 2.2+ (Froyo, API 8)
Other Sources:

Download

This version of Fahri Hamzah Android App comes with one universal variant which will work on all the Android devices.

Variant
4
(Feb 03, 2016)
Architecture
Unlimited
Minimum OS
Android 2.2+ (Froyo, API 8)
Screen DPI
nodpi (all screens)

All Versions

If you are looking to download other versions of Fahri Hamzah Android App, We have 1 version in our database. Please select one of them below to download.

Loading..