Icon Store 1.4 Icon
3.9
6.4K Ratings
100K+
Downloads
1.4
version
Jul 23, 2015
release date
2.9 MB
file size
Free
Download

What's New

fix some bugs:

1. some Iconpacks cant be used

2. some crash problem

About Icon Store Android App

Icon Store is the first market that only focusing on Icon Pack. Icon Pack, redesign all of your app icons in One Click! Try Icon Store to own a large number of FREE Icon Packs.

We will add new Icon Packs every day. So you can dress up your Android Home each day and enjoy our modernized trending designs.

Each icon is designed by our own independent designers.

And, there is a (very basic) option to find Icon Packs -- style catalog. We have classified Icon Packs by heat styles, very easy to find it in Icon Store’s home page.


Specifications:
• More than 100 Icon Packs in this first release version
• Each Icon Pack has more than 20 icons, included popular apps
• 12 types of styles, to meet your individual requirements
• Depending on your device display quality, the quality of the icon pack may vary


Contact
Feel free to contact us if you have any problems or suggestions.
E-mail: [email protected]

Other Information:

Package Name:
Requires Android:
Android 4.0+ (Ice Cream Sandwich, API 14)
Other Sources:

Download

This version of Icon Store Android App comes with one universal variant which will work on all the Android devices.

Variant
7
(Jul 23, 2015)
Architecture
Unlimited
Minimum OS
Android 4.0+ (Ice Cream Sandwich, API 14)
Screen DPI
nodpi (all screens)

All Versions

If you are looking to download other versions of Icon Store Android App, We have 1 version in our database. Please select one of them below to download.

Loading..