KSEB POCKET - Bill Pay, Compla 1.2 Icon

KSEB POCKET - Bill Pay, Compla

Projects OK Pvt Ltd Business
0
0 Ratings
10K+
Downloads
1.2
version
Aug 31, 2016
release date
2.5 MB
file size
Free
Download

What's New

All options for KSEB Bill Payment

More functions added in KSEB Pocket

Bugs fixed in KSEB Pocket

Simplified KSEB Online Payment

KSEB Quick Payment

etc...

About KSEB POCKET - Bill Pay, Compla Android App

KSEB :- KERALA STATE ELECTRICITY BOARD


KSEB Pocket is an android application specially designed for all KSEB subscribers in Kerala. It's providing features are listed below,

1. User Registration .

2. Bill Payment .

3. Quick Bill Pay .

4. Complaint Registration .

5. View Complaint Status .

6. New Alerts .

7. And Many More

Kerala State Electricity Board Ltd (KSEB Ltd) is a public sector agency under the Government of Kerala, India, that generates,transmits and distributes the electricity supply in the state. Established in 1957, the agency comes under the authority of the Department of Power. The KSEB, constituted by the Government of Kerala, by order dated 7.3.1957, under the Electricity (Supply) Act, 1948 is in the business of Generation, Transmission and Distribution of electricity and striving to provide quality electricity at affordable cost to all classes of consumers in the state of Kerala.

The history of electricity in the state is around one century old. The first effort in this direction was a private endeavour. Like many other modern infrastructure facilities, electricity also was first brought to the state by a British company - the Kannan Devan Hill Produce Company, Munnar. The first generating station of the state was set up on the right bank of a tributary of River Periyar in 1940. It was a hydroelectric project and that tributary named Mudirappuzha continues to be the site of large a number of hydroelectric projects in the state.

After a spell of 17 years, the attention of the state authorities turned to newer forms of generating energy. The Gov of Travancore set up a facility to supply electricity to the households of Thiruvananthapuram town. In 1927, a Thermal Power Station was established under government ownership at Thiruvananthapuram for production of electrical energy on commercial lines. Three oil engine generators, of a capacity of 65 kW each, were installed and commercial production started in 1929.This station was located at Thampanoor at Thiruvananthapuram. An Electrical Wing under the State Public Works Department was entrusted with the administration of the scheme.

The next significant development was the formation of a separate department for electricity in 1932 by His Highness Sri Chithirathirunal Maharaja and his Diwan Sir C P Ramaswami Iyer. The formation of the Electricity Department paved the way for notable developments in the field. Thermal generating stations were set up at Kollam, Kottayam and Nagercoil (now in Tamil Nadu) in 1934. By that time, the possibilities of hydroelectric generation attracted the attention of the technologists and the authorities.

Kerala being a land of mountains and rivers, it presented a fertile field for hydroelectric generation. The vast potential for hydroelectric generation in the state prompted the state authorities to take steps to establish stations for hydroelectric generation. The first of these ventures was the Pallivasal Hydroelectric Project, the construction of which was started in 1933. The first stage of the project was commissioned in 1940. Its capacity was 13.5 mW. By that time, a comparable electric transmission network had also been completed with 66 kV substations at Alappuzha, Mavelikkara, Kothamangalam, Kundara, Kalamasserry, Viyyur, Aluva, and Thiruvananthapuram, which were also commissioned in 1940 itself during April -May months

The Kerala state Electricity board started functioning under the direction of a newly formed Kerala government, on 31 March 1957. The first governing body consisted of 5 members, and was headed by the Chairman K P Sreedhara Kaymal. The staff of the erstwhile Department of Electricity of the Thiru-Kochi state were transferred to the KSEB.
The board has also set up several more hydel power stations within the state. As of 2008, the KSEB Ltd has a total installed capacity of State to 2657.24 MW and a consumer base of over 91,59,399.

Other Information:

Requires Android:
Android 2.3.2+ (Gingerbread, API 9)
Other Sources:

Download

This version of KSEB POCKET Android App comes with one universal variant which will work on all the Android devices.

Variant
3
(Aug 31, 2016)
Architecture
Unlimited
Minimum OS
Android 2.3.2+ (Gingerbread, API 9)
Screen DPI
nodpi (all screens)
Loading..