Landlords Electrical Checklist 1.0.12 Icon

Landlords Electrical Checklist

Pro Certs Software Ltd Productivity
0
0 Ratings
1K+
Downloads
1.0.12
version
Sep 15, 2024
release date
3.8 MB
file size
Free
Download

What's New

Mandatory Android Billing Library Update

About Landlords Electrical Checklist Android App

The Landlords Interim Electrical Visual Inspection Checklist solves the issue of proving the electrical installation is maintained and kept in a safe working order. BS 7671 IET Wiring Regulations recommend an interim electrical visual inspection is carried out at least every 12 months for ALL rental properties.

The interim electrical checklist details what to look for during the visual only electrical inspection, split into sections, once the task is completed you can select the item as passed (✓), failed (X) or N/A if not applicable.

At the end of the inspection you can save, print or email a PDF report of the routine check for your records.

Interim Electrical Inspections
- Easy to use checklist
- Save and print PDF copies
- Sign and date reports
- Add your own comments

The electrical checklist is split in to easy to navigate sections:
1) Property Details
2) Paperwork
3) Consumer Unit
4) Sockets and Switches
5) Lights
6) Smoke, Heat and Carbon Monoxide Alarms
7) General
8) Additional Comments

With the new forthcoming mandatory 5 yearly electrical installation condition report being introduced for private rental properties is it more important than ever to keep records of these checks for future reference should anything go wrong.

To ensure an electrical installation is continually maintained and kept in a safe working order for continued use a 5 yearly Electrical Installation Condition Report should be carried out at least every 5 years by a suitably skilled electrician, in addition to this an Interim Electrical Visual Inspection should be carried out at least every 12 months and at change of tenant.

In addition to having a 5 yearly Electrical Installation Condition Report (EICR) carried out, an Interim Visual Electrical Inspection should be carried out at least every 12 months and at change of tenancy.

Frequency of Electrical Inspections:


  • Full Electrical Installation Condition Report = Max 5 yearly

  • Landlords Interim Electrical Visual Inspection (routine check) = Maximum every 12 months and at change of tenancy.



  • Check out our full collection of electrical apps for Android in the Play Store.

Other Information:

Requires Android:
Android 7.0+ (N, API 24)
Other Sources:

Download

This version of Landlords Electrical Checklist Android App comes with one universal variant which will work on all the Android devices.

Variant
11
(Sep 15, 2024)
Architecture
Unlimited
Minimum OS
Android 7.0+ (N, API 24)
Screen DPI
nodpi (all screens)
Loading..