Omega Linkr 1.2 Icon
3.1
14 Ratings
16K+
Downloads
1.2
version
May 05, 2016
release date
44.8 MB
file size
Free
Download

What's New

Fixed issue with SMS command when app is force closed.

About Omega Linkr Android App

Linkr allows you to start, lock, unlock, activate trunk release, track, and more directly from your phone!

NOTE: An Omega Linkr system must be installed in your vehicle for this app to operate.
NOTE: Locations are sent by SMS message with a link to Google Maps.

Models:
LINKR-MOBILE-2G is an international (outside the USA) system that works on any GSM cellular network with a user supplied SIM card.
LINKR-M1 uses the Verizon network in the USA. Activations & subscriptions are available at www.OmegaLinkr.com.

Omega Linkr is a smartphone interface that gives you control of vehicle convenience & security features from virtually anywhere in the world! This app can directly control Omega's Excalibur line of remote start/security systems & Omegalink vehicle specific remote start kits. It can also be hardwired directly to the vehicle.

Omega Linkr allows you to safely and securely remote start, lock / unlock, or open your car's trunk from virtually anywhere in the world.
Receive alerts and notifications if your vehicle is violated when installed with any compatible remote start / security system.

Main Features:
- Multi-user support
- Multi-device support
- Easy swipe between devices
- 6 languages supported: English, Spanish, French, Malay, Romanian, Serbian
- Heartbeat / Auto-track from once per 1-30 days
- Excessive speed alert w/ selectable threshold
- Low car battery alert
- 2 selectable Geo-fences w/ alerts
- Selectable device icon
- Selectable control screen skin
- Panic from button in car or from app
- Check SIM balance (outside the USA only)
- Eaves drop feature allows you to listen to the vehicle's interior (outside USA only).
Optional LINKR-MIC required.
- Lock control
- Unlock control
- Trunk release
- Start / Stop Engine (optional remote start system required)
- 2 Auxiliary functions
- Dedicated starter disable function
- Assign up to 5 alert receivers

Other Information:

Requires Android:
Android 3.1+ (Honeycomb MR1, API 12)
Other Sources:

Download

This version of Omega Linkr Android App comes with one universal variant which will work on all the Android devices.

Variant
2
(May 05, 2016)
Architecture
Unlimited
Minimum OS
Android 3.1+ (Honeycomb MR1, API 12)
Screen DPI
nodpi (all screens)
Loading..