Reflexology 1.0.5 Icon
4.2
1.3K Ratings
100K+
Downloads
1.0.5
version
Jun 30, 2016
release date
17.0 MB
file size
Free
Download

What's New

About Reflexology Android App

A reflexology, it is therapy to take advantage of the phenomenon that changes occur at specific sites of the body by pressing a specific portion of the soles of the feet, primarily in order to fatigue and improved.

This app is easy to understand display an animation of how the site and if you press the foot-rubbing.
Depending on the site, Foot reflexology massage is different ways.
If you look at the app you can easily practice this massage, if you press hard to know how, just figure it is a foot massage until now very useful app.
I think at home, at work, in the bath, and you'll use in various situations.


Mode

[how to order fir]
I want to animate the flow of 26 items divided into a series of massage.
Improvement is expected to more effectively and will massage in this order.

[Selected from point]
You can see a massage from the point adaptation to worry about.

[Foot reflexology chart]
You can see the (chart) figures vase foot reflex zone.

Other Information:

Package Name:
Requires Android:
Android 2.3.2+ (Gingerbread, API 9)
Other Sources:

Download

This version of Reflexology Android App comes with one universal variant which will work on all the Android devices.

Variant
1000005
(Jun 30, 2016)
Architecture
armeabi-v7a
Minimum OS
Android 2.3.2+ (Gingerbread, API 9)
Screen DPI
nodpi (all screens)

All Versions

If you are looking to download other versions of Reflexology Android App, We have 2 versions in our database. Please select one of them below to download.

Loading..