Tutorial Microsoft Project 1.0 Icon

Tutorial Microsoft Project

Alsatia Media Books & Reference
4.5
2 Ratings
500+
Downloads
1.0
version
Jun 22, 2017
release date
7.6 MB
file size
Free
Download

What's New

About Tutorial Microsoft Project Android App

Tutorial Microsoft Project - This tutorial has been designed keeping in mind the needs of beginner level MS Project user. Project managers and Project planners from varied backgrounds who have not used MS Project, especially the 2013 edition before can use this tutorial for scheduling, planning, and reporting their projects of any size. This tutorial is designed with Project Standard features, hence there is no need of Project Professional.

MS Project, the project management software program by Microsoft, is a very handy tool for project managers that helps them develop a schedule, assign resources to tasks, track the progress, manage the budget, and analyze workloads for an ongoing project. This tutorial discusses the various features of the software program with examples for easy understanding.

Prerequisites

A basic understanding of Computers and Windows Operating System is all it takes to get started. Hardware: A reasonable home desktop configuration. Software: MS Project 2013 on Windows OS. (At the time of writing this tutorial, Project 2013 is not available for Mac)

If you enjoy using this App, would you mind taking a moment to rate it? It won't take more than a minute. Thanks for your support!

DISCLAIMER :
Content like Articles, Pictures and video in this application were collected from all over the web, so if I have violated your copyright, please let me know and it will be removed as soon as possible.

All copyrights and trademarks are owned by their respective owners. This app is not endorsed by or affiliated with Network Studios or any other affiliated entities.

Other Information:

Requires Android:
Android 3.0+ Honeycomb (API 11)
Other Sources:

Download

This version of Tutorial Microsoft Project Android App comes with one universal variant which will work on all the Android devices.

Variant
1
(Jun 22, 2017)
Architecture
Minimum OS
Android 3.0+ Honeycomb (API 11)
Screen DPI
nodpi (all screens)

All Versions

If you are looking to download other versions of Tutorial Microsoft Project Android App, We have 1 version in our database. Please select one of them below to download.

Loading..